Water ingress is the root cause of 80% of mold problems in Dubai properties. Our certified crews waterproof roofs, basements, bathrooms, balconies, and external walls using polyurethane, cementitious, and bituminous systems — all backed by a 10-year written warranty.
Cumulative totals across our UAE operations since 2015.

































Proudly the only Mold Removal Company with Industry Certifications
A team you can trust — with real world knowledge
Every mold colony needs moisture to grow. In Dubai, that moisture comes from five predictable sources — each requiring a different waterproofing solution. Fixing the visible mold without fixing the water source guarantees regrowth within weeks. Our survey identifies which waterproofing system your property needs, where it has failed, and what the repair will cost.
Polyurethane liquid-applied membrane, torch-on bituminous, or EPDM sheet system. Covers flat roofs, sloped roofs, parapets, and roof penetrations. Includes pre-application survey, substrate preparation, priming, two-coat application, and 10-year warranty.
Negative-side or positive-side tanking with cementitious crystalline slurries (Xypex, Penetron) or polyurethane injection for hydrostatic pressure. Includes crack routing, chemical injection, and compartment testing.
Pre-tile liquid-applied membrane (Mapelastic, Kerdi) on showers, tubs, and floor drains. Includes substrate prep, membrane, mesh reinforcement on joints, flood testing before tiling.
UV-resistant liquid-applied polyurethane over existing screed, with drainage upgrades. Includes parapet wall waterproofing and planter-box tanking where relevant.
Silicone or siloxane-based hydrophobic impregnation, elastomeric crack bridging, and render-repair for facade degradation. Breathable systems prevent trapped moisture.
Thermal imaging, moisture mapping, and pressure testing identify every leak source and failing waterproofing. You receive a written report with photos, a priority-ranked scope, and a fixed quote.
Existing failing membranes removed, substrate cleaned and repaired, cracks routed and filled, primer applied. Skipping this step is the #1 reason competitor waterproofing fails within 2–3 years.
Two or three coats of the system selected (polyurethane, cementitious, bituminous, elastomeric) with mesh reinforcement on joints. All coats checked for thickness before next coat.
Completed work flood-tested (24 hours for wet areas, 72 hours for roofs). You receive a 10-year written warranty, material data sheets, and application records.
Mold spreads within 24–48 hours in Dubai’s humidity. Whether it is your home, office, or commercial space — our inspectors will assess the property, document findings, and provide a fixed written quote.
UV exposure and thermal cycling degrade inferior materials. Most failures are traced to three causes: inadequate substrate preparation, single-coat application (when two coats were needed), or use of generic paint marketed as waterproofing. We apply only manufacturer-certified systems with a minimum 10-year warranty.
Usually no for external work (roofs, balconies, external walls). For bathrooms we ask you to vacate the wet area for 48 hours to allow the membrane to cure and be flood-tested before re-tiling. Basements require temporary relocation of stored items but the space itself remains accessible.
Yes. Developers are obligated to correct waterproofing failures during the DLP (usually 1 year for finishes, 10 years for structural waterproofing). Our survey report documents failures in developer-supplied waterproofing and is accepted as evidence for defect-liability claims.
No. Mold must be removed first. Waterproofing over active mold traps spores and accelerates substrate deterioration. We coordinate mold removal and waterproofing as a combined project so you are not paying two separate mobilisations.
Written 10-year warranty on materials and workmanship, transferable with property sale. Covers re-treatment of any area that fails to prevent water ingress as documented at handover. Does not cover damage from structural movement, impact, or subsequent modifications.
Tell us about your mold issue and we’ll arrange a mold consultation within 24 hours. No sales pressure — just honest expert advice from Dubai’s most certified mold team.